SURFACE PREPARATION- Fresh masonry or concrete surface must be allowed to cure for at least 14 days. Concrete must be clean and rough. All oil, grease, dirt, debris, paint and unsound concrete must be removed. All cracks>1mm should be filled with suitable crack fillers.
Prime the prepared surface by mixing 1 part QCURE with 1 part water and 2 parts Portland cement with brush, roller or spray. After the primer coat is completely dried, Mix QCURE with water and portland cement in the ratio of 1 part QCURE:0.5 part water:2.5 part cement using slow speed mixer to produce lump free homogeneous slurry. On damp surface, apply the first coat using brush or roller in one direction. Minimum 2-3 coats are recommended depending on the nature of the surface. For better results Glass Fibre Mesh/Cloth can be embedded in between the 2 coats. Clean tools and equipments with fresh water before the material hardens.